    • 各个房间在哪里放置灯也要先确定好;厨房要多留电源插座;预先想好空调安装几个,是柜机还是挂机,以便决定插座的位置;要想好预留灯位、浴霸位、厨房烟道位以及今后检查口;如果有环绕音箱,要在客厅电视墙对面预留音响线的出口,以备最后放置环绕音箱;卫生间应该设置涮洗墩布的出水口,愿意的话可以买个墩布池;整体橱柜最好在开工前确定,方便确定以后的水管、燃气管道的改造。开工前,就应让工人确定卫生间马桶和洗手盆的墙距,以便有充足的时间选到合适的卫浴设施。
    • *中期验收以免返工

        如厨房和卫生间的防水、地面暗埋的水电管路,若地砖施工完毕后发现防水不合格、电线管路不通、水暖管道不通或漏水,那只能重新返工。

        洗衣机地漏最好别用深水封地漏,因为下水太慢,不能满足洗衣机需要,完工后留好平面图

        水电完工验收后最好出水电改造图,电路、水路的走向要标明确,还要标明尺寸。

Posted from Diigo. The rest of my favorite links are here.

Advertisements

About sandykwok

Live with dream and passion Pursue the desire deep in my heart. A girl love fancy food,communicating with each other and go hiking. Sometimes got lost in thinking serious things.
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s